Photo Gallery

SCM Berta Operation

June 2017 Trucking Pregnant Leach Solution from Berta to Nora Plant

Filling the Pregnant Leach Solution (PLS) foreground - filling trucks with PLS for transport to the Nora plant in background.
Filling trucks with Pregnant Leach Solution at the Berta Operation to transport to the Nora Plant
Pregnant Leach Solution pond at Berta operations

June 2017 Coro Management Team

CEO Luis Tondo
Executive Director Alan Stephens
VP Operations Marcelo Cortes
L-R: VP Operations Marcelo Cortes, Executive Director Alan Stephens, CEO Luis Tondo

April 2017

Crusher at Berta
Crushing circuit at Berta
Crusher at Berta
Pond lining at Berta
Agglomerator at the crushing site
Oxidized mineralization at Berta
Coro’s board of directors touring the Berta facility
Copper cathode (plates) stacked at site for shipping
Processing water pond at Nora plant
Electrowinning circuit at Nora plant
A representative from ProPipe (35% owner of SCM Berta) speaks with the Coro board

2017

2016

Figure 1: 2016 Copper Cathode Production from Nora
Figure 2: 2016 EW Plant Prior to Expansion
Figure 3: 2016 Leach Pads at Nora
Figure 4: Tertiary Crusher at Nora
Figure 5: 2016 New Mobile Crusher at Nora
Figure 6: Dozer working at Nora
Figure 7: 2016 View of Nora Plant
Figure 8: Berta Location and Other Porphyry Copper Operators
Figure 9: Area of Berta Sur and Berta Central Oxide Resource
Figure 10: Grade Distribution at 1710m Elevation
Figure 11: Berta Proposed Open Pits
Figure 12: SCMB First Copper Cathode)
Figure 13: Visual Copper at Berta

Marimaca/Ivan Operation

April 2017

Former Ivan leach pads
Surrounding Ivan plant
Ivan operation
Ivan operations landscape
Spent open pit at Ivan
Machinery at Ivan has been on care and maintenance since 2012
Tanks at Ivan plant
Overlooking the solution pumping facility
Overlooking the former ponds and pads at Ivan
Coro board of directors tour of the Ivan facilities
Part of the former pumping facilities to bring solution from the leach pads to the processing plant
VP Exploration, Sergio Rivera explaining the geological structure of the Marimaca property (centre)
Roadside geology lesson for the directors and management team
Board & management at the upper reaches of the Marimaca property looking to the north
Collared drill hole at Marimaca, dipping to the northwest, photo looking toward the ocean, 20km to the west
A series of dirt roads wind through the Marimaca property
Looking to the west from approximately 700 metre elevation at Marimaca
Core stored at the exploration encampment at Marimaca
CEO Alan Stephens offering details of the drill program at Marimaca from which the maiden resource estimate was calculated.
Brochantite and chrysocolla constitute much of the enriched oxidization

2017

2016

Figure 1: Marimaca Looking NW East Sector
Figure 2: Marimaca Looking E East Sector
Figure 3: Marimaca Looking NE West Sector
Figure 4: Sept 2016 Drilling (MAD-01)
Figure 5: Copper oxidation near Drill Hole MAR-19